Project designer: STROYCONSALTING LLPDesign estimate documentation 0,8 mln. tg.

Location: М. Mametiva, Shaikenov Streets -11 microdistricts

DESCRIPTION:

  • Production and installation of the monument in size: length - 6.5m., width - 4.2m., height of the pedestal- 10m.

  • Lightening of the monument

  • Landscaping of the area of 0.12 ha

The Design is being completed. According to budget calculations the cost of the following work is:

  • The cost of construction work for pedestal construction and landscaping of the area –  34 mln. tg.

  • Cost of monument production and installation – 50 mln. tg.

Totally: 84 mln. tg.