The construction of pedestal and landscaping of the surrounding area with the building of monument to honour Zhalangtoss-Bahadur Batyr in Aktobe city

Project designer: INSHAB LLP – Design estimate documentation 1,9 mln.tg.

Location: in the area of "Sapar" bus station

DESCRIPTION:

Production and installation of the monument in size: length - 6.0m., width - 4.0m., height of the pedestal- 10m.

Lightening of the monument

Landscaping of the area of 0.08 ha

The Design is being completed. According to budget calculations the cost of the following work is:

The cost of construction work for pedestal construction and landscaping of the area – 35 mln. tg.

The cost of monument production and installation – 60 mln. tg.

TOTALLY: 95 mln. tg.